Controls Migration

Legacy PLC and HMI modernisation with controlled cutover planning.

Migration planning for S7-300/S7-400, older Rockwell/Modicon and other installed-base control systems.

Engineer reviewing an industrial electrical control system
CONTROLS MIGRATION ASSESS
MIGRATE
VALIDATE
01

Asset Inventory

Capture the exact installed control system before selecting replacement hardware.

  • CPU and firmware
  • I/O modules
  • Network cards
  • HMI/SCADA
  • Drives and third-party devices
02

Backup & Baseline

Secure the current system before changes begin.

  • PLC source
  • HMI project
  • Drive parameters
  • Network configuration
  • Version record
03

Migration Mapping

Define how old hardware/software maps into the new platform.

  • I/O mapping
  • Tag mapping
  • Data structure review
  • Network replacement
  • Unsupported functions
04

Software Re-engineering

Port or rebuild the application in a maintainable structure.

  • Sequence logic
  • Reusable blocks
  • Alarm logic
  • Device control
  • Diagnostics
05

Offline Testing

Validate the new application before field cutover.

  • Simulation
  • Sequence tests
  • Alarm tests
  • Interface tests
  • Abnormal conditions
06

Cutover & SAT

Execute the migration with controlled site testing.

  • I/O check
  • Device commissioning
  • Functional SAT
  • Defect closure
  • Backup and handover
Talk to an engineer

Discuss this service with Samarth Automation Pty Ltd.

Send Enquiry
WAWhatsApp