FAT / SAT / Commissioning

Structured controls validation from workshop testing to live operation.

FAT, SAT and commissioning support for PLC, SCADA, conveyors, BHS, warehouse and logistics systems.

Industrial engineer commissioning production machinery
FAT / SAT / COMMISSIONING TEST
PROVE
START
01

FAT Planning

Define what should be demonstrated before shipment or site integration.

  • Test scope
  • I/O simulation
  • Sequence matrix
  • Interface simulation
  • Acceptance criteria
02

PLC / HMI FAT

Validate software behaviour in a controlled environment.

  • Normal sequences
  • Fault scenarios
  • Alarm handling
  • Mode changes
  • Reset/restart behaviour
03

SAT Preparation

Prepare site test structure and responsibilities.

  • I/O sheets
  • Device lists
  • Network checklist
  • Safety interfaces
  • Open defect list
04

Site Commissioning

Bring controls and field equipment online systematically.

  • I/O checkout
  • Drive commissioning
  • Network/device setup
  • Sequence testing
  • SCADA validation
05

Operational Trials

Test the system under realistic operating conditions.

  • Routing trials
  • Jam/recovery tests
  • Throughput support
  • Exception handling
  • Operator scenarios
06

Handover

Leave a supportable system after commissioning.

  • Final backup
  • Software versions
  • Open issues
  • As-built notes
  • Recovery record